| SHIP NAME: |
PORT: |
|
| This Checklist is to be completed by the Officer on Watch prior to Anchoring and a Log Entry made. |
INITIALS |
| Has an Anchoring Plan been prepared taking into account: |
|
| Speed Reduction in ample time? |
|
| Direction/Strength of Wind, Current? |
|
| Tidal Stream when manoeuvring at low speeds? |
|
| Need for adequate sea room particularly to seaward? |
|
| Have the following been informed of the time of “Standby” for Anchoring |
|
| The Master? |
|
| The Engineroom? |
|
| The Anchor Party? |
|
| Is the following equipment ready for use? |
|
| Anchor(s)? |
|
| Lights/Shapes? |
|
| Sound Signalling Apparatus? |
|
| Anchor Marking Buoy? |
|
| Has an Anchor Watch been established? |
|
| Have instructions been issued to the Officer of the Watch/Engineroom on the following matters? |
|
| Determining and regular checking of Anchor Position? |
|
| Notice for Main Engines especially if weather deteriorates? |
|
| Anti-fouling precautions? |
|
| OFFICER’S ON WATCHSIGNATURE: DATE: |
|
|
|