| M.V./S.S.: |
CHECKLIST |
Page 2 of 3 |
|
|
|
|
YES |
NO |
REMARKS |
| PART 1 |
| 1.0 |
Have all persons been briefed on |
|
|
|
|
|
|
|
|
the requirements of the work? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2.0 |
Are all persons competent to carry |
|
|
|
|
|
|
|
|
out the work? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3.0 |
Have all personnel been provided |
|
|
|
|
|
|
|
|
with the Personal Protective |
|
|
|
|
|
|
|
|
Equipment necessary for the task |
|
|
|
|
|
|
|
|
being undertaken? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4.0 |
Are Isolation Valves secured or |
|
|
|
|
|
|
|
|
locked in closed position and |
|
|
|
|
|
|
|
|
suitably labelled to prevent thembeing inadvertantly opened? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5.0 |
Is the part of the system to be |
|
|
|
|
|
|
|
|
Worked upon effectively isolated by |
|
|
|
|
|
|
|
|
Closing the appropriate valves |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6.0 |
Have personnel been instructed to |
|
|
|
|
|
|
|
|
slacken Nuts and Bolts slowly before |
|
|
|
|
|
|
|
|
breaking the joint, not to remove |
|
|
|
|
|
|
|
|
Bolts completely, and to stand clear |
|
|
|
|
|
|
|
|
of the path that will be followed bythe release of any residual pressurein the system |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7.0 |
Has pressure been bled off the part |
|
|
|
|
|
|
|
|
of the system to be worked on by |
|
|
|
|
|
|
|
|
opening Drain Cocks or Vents as |
|
|
|
|
|
|
|
|
appropriate and ensuring that |
|
|
|
|
|
|
|
|
pressure remains off? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8.0 |
Has a copy of this Permit been |
|
|
|
|
|
|
|
|
posted at the place of work? If the |
|
|
|
|
|
|
|
|
vessel is a Chemical or Gas Carrier, |
|
|
|
|
|
|
|
|
also complete part 2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9.0 |
Have all Valves and Pipes been |
|
|
|
|
|
|
|
|
re-secured properly on completion |
|
|
|
|
|
|
|
|
of the work? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Chief Engineer’s Signature: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|